WELLINGS OF Whitby®
Opening Winter 2024
Location:
Whitby, Ontario
Number of Units:
404 total (Phases 1 & 2)
Floors:
15 Floors, two towers
Frame Construction:
Cast in place reinforced concrete structure with steel stud infill
Exterior:
Pre-finished metal siding and window wall
Notables:
Underground parking, exterior terraces and patios, high walkability score
Address:
372 Taunton Road East, Whitby, ON
WELLINGS OF Calgary®
Opening Summer 2024
Location:
Calgary, Alberta
Number of Units:
275 total (Phases 1 & 2)
Floors:
Up to 15 Floors, two towers
Frame Construction:
Cast in place reinforced concrete structure with steel stud infill
Exterior:
Pre-finished metal siding and window wall
Notables:
Underground parking, exterior terraces and patios, high walkability score
Address:
1021-25 Na’a Drive SW
Calgary, AB
WELLINGS OF Winchester®
Currently Leasing Phase 3,
Available for Move-in Summer 2024
Location:
Winchester, Ontario
Number of Units:
Phase 1 of 6; approximately 400 townhome-bungalows plus Clubhouse
Floors:
Townhome-bungalows, one storey
Frame Construction:
Slab-on-grade and wood framing, sloped roofline
Exterior:
Steel siding
Notables:
Fully furnished clubhouse, radiant floor heating, high-efficiency on-demand hot water system, stone composite flooring throughout
Address:
Main Street West & County Road 3, Winchester, ON
WELLINGS OF STITTSVILLE®
Phase 2 Currently Leasing and Under Construction
Location:
Stittsville, Ontario
Number of Units:
186
Floors:
5
Frame Construction:
Concrete slab and steel framing
Exterior:
Brick and siding
Notables:
Full build sprinkler system & patios, balconies throughout, underground parking and exterior pond
Address:
2500 Wellings Private, Stittsville, ON
WELLINGS OF CORUNNA®
140,000 sq ft, 8,000 sq ft atrium
Location:
Corunna, Ontario
Number of Units:
132
Floors:
4
Frame Construction:
Concrete slab, metal and wood framing, steel and concrete atrium
Exterior:
Brick and siding exterior
Notables:
Full build sprinkler system & patios and balconies throughout
Address:
180 Bunker Ave., Corunna, ON
WELLINGS OF PICTON®
Opened December 2016
105,000 sq ft, 8,000 sq ft atrium
Location:
Picton, Ontario
Number of Units:
88
Floors:
4
Frame Construction:
Concrete slab, metal and wood framing, steel and concrete atrium
Exterior:
Brick and siding exterior
Notables:
Full build sprinkler system & patios and balconies throughout
Address:
15 Wellings Drive, Picton, ON
Wellings Of Waterford®
Opened May 2013
Location:
Waterford, Ontario
Number of Units:
24
Frame Construction:
Concrete and wood framing
Exterior:
Brick and siding exterior
Notables:
Private patios throughout
Address:
111 Bruce St., Waterford, ON
Queensview Retirement Community & Villas
Opened 2013,
Independent Villas and Main Residence with Personalized Care
Location:
Paris, Ontario
Number of Units:
Villas: 24
Main Building: 75
Frame Construction:
Villas: Concrete floor, wood framed
Main Building: Concrete slab, wood framing
Exterior:
Brick and siding exterior
Notables:
Main residence and independent Villas on site
Address:
70 King Edward St., Paris, ON
Harbour Hill Retirement Community
Opened 2014
Retirement Living with Care.
Phase 1 has 64 units, 4 floors, personalized care.
Opened 2022
The Apartments at Harbour Hill
Phase 2, 4 floors, 75 carefree 55 plus apartments.
Location:
Goderich, Ontario
Number of Units:
139
Floors:
4
Frame Construction:
Concrete slab, wood framing
Exterior:
Brick and siding exterior
Notables:
Full build sprinkler system, patio or balcony on all suites
Address:
104 Suncoast Dr., Goderich, ON
Empire Crossing Retirement Community
Opened 2015
Location:
Port Hope, Ontario
Number of Units:
64
Floors:
4
Frame Construction:
Concrete slab, wood framing
Exterior:
Brick and siding exterior
Notables:
Full build sprinkler system, patios and balconies throughout
Address:
224 Ward St., Port Hope, ON
HARVEST RETIREMENT COMMUNITY
Opened 2012
Two Phase Build
Location:
Tillsonburg, Ontario
Number of Units:
100
Floors:
4
Frame Construction:
Formed concrete, wood frame
Exterior:
Brick and siding exterior
Notables:
Full build sprinkler system, patio or balcony on all suites
Address:
15 Harvest Ave, Tillsonburg, ON
KINGSMERE
Opened 2009
Location:
Alliston, Ontario
Number of Units:
100
Floors:
6
Frame Construction:
Formed concrete, wood frame
Exterior:
Brick and stone exterior
Notables:
Full build sprinkler system & patios and balconies through out
Address:
287 King St. S., Alliston ON
COMPASS HOMES – ALLISTON TOWNHOMES
Opened 2006
Location:
Alliston, Ontario
Number of Units:
129
Frame Construction:
Wood framed with garages
Exterior:
Brick and stone exteriors
Notables:
Freehold townhomes
Address:
287 King St. S., Alliston ON
LINCOLN PARK
Opened 2006
Location:
Grimsby, Ontario
Number of Units:
70
Floors:
4
Frame Construction:
Core Slab, concrete and steel
Exterior:
Brick and stone exterior
Notables:
Full build sprinkler system, patio or balcony on all apartments
Address:
265 Main St. E., Grimsby, ON
Island Park
Opened 2005
Location:
Campbellford, Ontario
Number of Units:
85
Floors:
3
Frame Construction:
Concrete slab, wood frame
Exterior:
Brick exterior
Notables:
Full build sprinkler system, patio or balcony on all apartments
Address:
18 Trent Dr., Campbellford, ON
ISLAND VIEW ARNPRIOR
Two Phase Build
Location:
Arnprior, Ontario
Number of Units:
115
Floors:
5
Frame Construction:
Concrete, wood frame construction
Exterior:
Brick exterior
Notables:
Full build sprinkler system, patio or balcony on all suites
Address:
30 Jack Cresent, Arnprior, ON
CAROLINA PERTH
Three Phase Build
Location:
Perth, Ontario
Number of Units:
140
Floors:
4
Frame Construction:
Wood framed
Exterior:
Brick exterior
Notables:
Full build sprinkler system & patios and balconies through out
Address: